News Story Manager

Results:
Tag: drainage ditch
Clear
  • August

    Critical drainage channels to be maintained

    Throughout its history, the Lower Mississippi River Flood Plain has been besieged by floodwaters; that’s why flood risk management is one of the Memphis District's major mission areas. We serve as the first line of defense for the entire lower Valley. Working to execute this mission and serving as that first line of defense, a Memphis District Project Delivery Team awarded three major contracts to perform maintenance on drainage channels 1 and 251, which are located in the Little River Drainage District in Southeast Missouri. The contracts are for lower Ditch 251, upper Ditch 251, and upper Ditch 1 and authorize contractors to go in and return a total of 89 miles worth of drainage channels to their authorized level of flood protection.