bullet

Caving of vertical face prior to soil nail installation (Approx. Station 14+50)

bullet

Installation of wire mesh and drainage strips along vertical face (Soil Nail Elevation 432.75)

bullet

View of construction looking to the West

bullet

Closer view of construction looking to the West

bullet

Excavation of vertical face using bulldozer

bullet

Use of cuttings from soil nail installation to stabilize caving of vertical face

bullet

Finish cut of vertical face along West end looking to the South

bullet

Additional rebar reinforcement along vertical cut

bullet

Seepage from Continental Formation

bullet

Shotcrete operation along vertical face