Caving of vertical face prior to soil nail installation (Approx. Station 14+50)
Installation of wire mesh and drainage strips along vertical face (Soil Nail Elevation 432.75)
View of construction looking to the West
Closer view of construction looking to the West
Excavation of vertical face using bulldozer
Use of cuttings from soil nail installation to stabilize caving of vertical face
Finish cut of vertical face along West end looking to the South
Additional rebar reinforcement along vertical cut
Seepage from Continental Formation
Shotcrete operation along vertical face