First row of soil nails with wire mesh and Miradrain 6000 (Soil Nail Elevation 462)
View of construction looking West, lower trackhoe at elevation 400.
View of soil nail operation looking East (Work Bench Elevation 460).
Top of Bluff approximately 130 feet above sand fill.
Close up view of Miradrain 6000 drainage strip
Drilling soil nails with solid drill stem through debris area