View of soil nail operation looking West (Soil Nail Elevation 456)

bullet

Fill being placed at Southwest corner to allow for benching operation (60' high fill)

bullet

View of construction looking West (Work Bench Elevation 454)

bullet

Location of debris exposed during excavation

bullet

Rough and finish cut grading

bullet

Installation of soil nail

bullet

Grouting of the soil nail

bullet

Delivery of ready mix grout to grout pump

bullet

Installation of wire mesh for shotcrete

bullet

Sloughing talus pile embankment at Elev. 400 due to increased pore pressures from filling operations

bullet

Finish grading operation

bullet

Air content test for shotcrete (8% +/- 1%, required)

bullet

Shotcrete operation

bullet

Applying curing compound to shotcrete

bullet

Buried tires and debris in excavation slope

bullet

Crack at elevation 400 near toe of Southwest corner fill

bullet

Gravel Drain at elevation 400 bench to improve drainage of Talus pile

bullet

Shotcrete operation (minimum 6" facing)