bulletNortheast view of upper access road and curb ditch. Contractor cutting east abutment slope.
bulletWest view of site. Contractor installing second lift of soil nails on lower bluff.
bulletWest view of site.
bulletWest view of site. Contractor installing second lift of soil nails on lower bluff.
bulletCloseup of drill rig used to install soil nails.
bulletDrainage strips and reinforcing before shotcrete.
bulletView of western half of bench area (Approx. elev. of 390.0)
bulletSouth view from sand berm fill (Elev. 340.0) of shotcrete wall (Top of wall elev. 460.0).
bulletSouth view from sand berm fill of construction operation.