Northeast view of upper access road and curb ditch. Contractor cutting east abutment slope.
West view of site. Contractor installing second lift of soil nails on lower bluff.
West view of site.
West view of site. Contractor installing second lift of soil nails on lower bluff.
Closeup of drill rig used to install soil nails.
Drainage strips and reinforcing before shotcrete.
View of western half of bench area (Approx. elev. of 390.0)
South view from sand berm fill (Elev. 340.0) of shotcrete wall (Top of wall elev. 460.0).
South view from sand berm fill of construction operation.