bulletMulching operation.
bulletOverall view from east end.
bulletErosion in upper access road along face of drain due to runoff from 5-inch rain.
bulletErosion in upper access road along face of drain due to runoff from 5-inch rain.
bulletRiprap drain and stability berm at base of lower bluff.
bulletOutlet drainage ditch.
bulletOverall view of west end taken from sand berm.
bulletOverall view of east end taken from sand berm.
bulletPlacement of Gabions and lightweight fill at El. 454.0