Microstation
Converting Survey Levels from V7 Standards to V8 Standards
This workflow will allow you to take a survey file that is typically in V7 and has a level sytem with numbers and convert the levels to a descriptive name and also give you a standard color, weight, and line style for each of those levels.
[ Download/View File ]
Aug 27, 2004, 15:27
River Engineering
File and Serial Number Request
This is a request for the file and serial number for the designer's plans and specifications. This request should be done early in the design process before the reviews. This request is taken to map sales to be filled out for the project id, file, and serial numbers.
[ Download/View File ]
Mar 1, 2006, 08:12
River Engineering
Design Authentication
This is the final signatures requried for the design to be finalized.
[ Download/View File ]
Mar 1, 2006, 08:11
River Engineering
BCOE Review Requests
This is a go-by for the designer in starting the BCOE process. The designer needs to provide 30 days for review.
[ Download/View File ]
Mar 1, 2006, 08:09
River Engineering
:
Dike Design
Step 2 - Creation of the DTM surface from XYZ data
This is a step process to allow the designer to create a DTM from XYZ data submitted by the contractor.
[ Download/View File ]
Mar 1, 2006, 07:05
|
|
 |

|