ImageGallery

Virtual pre-construction conference for the Ditch 251 Upper Channel Cleanout project.
IN THE PHOTO, CAO successfully conducts a virtual pre-construction conference for the Ditch 251 Upper Channel Cleanout project. The critical $8,890,292 cleanout project is to return a 30-mile reach of Ditch 251 to its authorized level of flood protection.

Download Image: Full Size (0.13 MB)
Tags:
Photo by: Memphis District |  VIRIN: 200831-A-YI354-0001.JPG