Workers drilled two holes through the top of the gate then installed pins through the holes. Each pin was nine inches in diameter and four feet six inches long. Once the pins were in place, collars were welded around the pins to help stabilize them. The final step was to install pad eyes so a crane could lift each gate and gently lay it down on a waiting platform barge.