ImageGallery

Key USACE structure to get “facelift”
IN THE PHOTO, Members from each team responsible for the Stringout Project take a tour of the area scheduled to undergo construction, which is scheduled for completion sometime in the spring of 2022. (USACE photo by Jessica Haas)

Download Image: Full Size (4.18 MB)
Tags:
Photo by: Jessica Haas |  VIRIN: 191029-A-LD870-2001.JPG