ImageGallery

Work nears finish line on Farrenburg Levee Renovation
IN THE PHOTO, A view of one of the outlet structures on one of the Farrenburg Levee culverts. The overhead walkway allows access to the controls for the flood gate that operators close to block the backflow of water into protected areas, or open to allow drainage of any impounded water.

Download Image: Full Size (1.98 MB)
Tags:
Photo by: Jessica Haas |  VIRIN: 200128-A-CE999-1001.JPG