ImageGallery

Corps, multiple teams ready to construct Memphis ACF
IN THIS PHOTO, Construction Company AECOM Hunt Vice President Doug Utt led a group to the fourth floor where much demolition was taking place. He explained lots would be removed to include old lighting, flooring, dropped ceiling, and unwanted walls. (USACE photo by Jessica Haas)

Download Image: Full Size (2.78 MB)
Tags:
Photo by: Jessica |  VIRIN: 200418-A-LD870-2013.JPG