US Army Corps of Engineers
Memphis District Website

Grand Prairie Widened Canal Project pre-final inspection
IN THE PHOTOS taken during the pre-final inspection, are various components of the Widened Canal project, which include the inlet structure, storage reservoir, outlet structure, and outlet control gates.

Download Image: Full Size (1.53 MB)
Tags:
Photo by: Memphis District |  VIRIN: 200619-A-YI354-0001.JPG