ImageGallery

Farrenburg Levee Phase 5 project
FARRENBURG LEVEE PHASE 5 project consists of replacing two culverts that cross under the Farrenburg Levee; closing a gap in the levee; and raising sections of the levee to the authorized grade.

Download Image: Full Size (0.26 MB)
Tags:
Photo by: Memphis District |  VIRIN: 200904-A-YI354-0002.JPG