ImageGallery

Memphis District celebrates New Madrid stormwater ditch replacement project with ribbon-cutting ceremony
IN THE PHOTOS, the Memphis District held a ribbon-cutting ceremony, to celebrate a fully functioning stormwater ditch replacement project in the New, Madrid, Missouri area, on Apr. 12, 2021. A $3.4 million contract was awarded for two work areas to Tarpan Construction LLC., on Aug. 29, 2019. (USACE photos by Vance Harris)

Download Image: Full Size (0.16 MB)
Tags:
Photo by: Vance Harris |  VIRIN: 210413-A-QE391-2010.JPG