District News Stories

Results:
Tag: Missouri
Clear
  • March

    Project Update | St. Johns Outlet Scour Repair

    The Memphis District's St. John's Outlet Scour Repairs project, near New Madrid, Missouri, continues making progress as workers are now placing stone to protect the outlet control structure and bayou from erosion and scouring due to the interior drainage and Mississippi River backwater effects.
  • January

    Memphis District employee helps rescue mother, three daughters

    Mr. Shaun Bass, a Construction Control Inspector from the Memphis District's Caruthersville Area Office, witnessed a horrific car accident occur right in front of him while travelling for work in July of 2022. The accident involved a mother and her three children driving head on into a bridge embankment. He was able to call 911 and tend to the mother before the first ambulance arrived. Once the first ambulance was onsite, he directed traffic around the accident while assisting paramedics with the children as needed. Amazingly, the mother and three children survived, yet arguably, if it were not for Bass and the ambulance personnel, this story may have had a much more tragic conclusion. This is his recollection of that day's events.
  • April

    Rep. Jason Smith, Mississippi River Commission celebrate groundbreaking of new Caruthersville Floodwall

    The Memphis District held a groundbreaking ceremony in Caruthersville, Missouri, April 3, 2022, to celebrate a federally funded project to replace the Caruthersville Mississippi River floodwall. The new floodwall will enhance the safety of more than 135,000 residents, $6.28 billion of property, and $7.5 billion of agriculture.
  • Memphis District celebrates New Madrid stormwater ditch replacement project with ribbon-cutting ceremony

    The Memphis District held a ribbon-cutting ceremony to celebrate a fully functioning stormwater ditch replacement project in the New Madrid, Missouri area, on Apr. 12, 2021. A $3.4 million contract was awarded for two work areas to Tarpan Construction LLC., on Aug. 29, 2019.
  • March

    Ready to Advertise St. Francis Floodway Project

    In partnership with the Dunklin County Levee District Number 4, the U.S. Army Corps of Engineers Memphis District recently met a tasker “ready to advertise” milestone, ahead of schedule, for the St. Francis Floodway Blockage Project in Cardwell, Missouri, Feb. 17, 2021. As a result of the storms and resulting flood impact in this region, sedimentation and debris built up in drainage channels reduce the capacity to drain stormwater runoff adequately. The work associated with this project will increase the channel's capacity and reduce the chances of localized flooding, threatening property damage, and life safety.