District News Stories

  • September

    PDT awards drainage channel cleanout contract

    Congratulations to the Iron Mines Creek Channel Cleanout Project Delivery Team (PDT). The PDT recently reached its contract award milestone, awarding the contract to small business contractor Innovative Performance Construction. Work on the contract includes the cleanout of 3.9 miles of the Iron Mines Creek channel located in Marked Tree, Poinsett County, Arkansas.
  • USACE provides power to hard-hit Louisiana

    Living in the 21st century, most Americans have electricity on demand. When it isn’t working, it usually doesn’t take longer than a day to get it turned back on. But what happens when a storm like Hurricane Laura hits? Close to 200,000 residents living in southwestern Louisiana lost power on Aug. 27. Many of them are still without it, weeks after the storm has come and gone. Delivering power to southwest Louisiana is one of the U.S. Army Corps of Engineers' top priorities. USACE is installing generators in several critical facilities like water pump stations, sewage lift stations, hospitals, radio towers, and corrections facilities, to name a few. The 23-person team responsible for installing these generators ensured they were in Louisiana before Hurricane Laura even made landfall.
  • Corps of Engineers fully engaged in LA Hurricane recovery efforts

    When Hurricane Laura struck Lake Charles, Louisiana, U.S. Army Corps of Engineers (USACE), Mississippi Valley Division (MVD) response and recovery teams were already in place to execute the critical mission assignments assigned by the Federal Emergency Management Agency. Damages sustained in southwestern Louisiana warrant USACE expertise. Mission assignments range from temporary roofing and emergency power installation to supporting the temporary housing mission and conducting infrastructure assessments and providing debris removal technical assistance to the state.
  • First temporary ‘Blue Roof’ a success

    “The governor happened to have a news conference and my wife said, well what about the blue roofs?” Duhon said. “She gave me the information and I got online and registered and here we are today.” The purpose of the program is to provide homeowners in disaster areas with fiber-reinforced sheeting to cover damaged roofs until permanent repairs can be made. The deadline to sign up for the Blue Roof Program is Sept. 21. Don't wait!
  • District awards contract for Farrenburg Levee Phase 5 project

    Congratulations to the Farrenburg Levee Phase 5 Project Delivery Team (PDT) for advancing their project to the important Contract Award milestone. The team awarded the contract to VuCon, LLC. on August 30. Work the contractor will perform consists of replacing two culverts, which have reached their life expectancy,  that cross under the Farrenbeurg Levee, closing a gap in the levee and raising sections of the levee to the authorized grade. Drainage infrastructure like this is a vital part of the overall levee protection system.